Challenges of the Mid Coast

Challenges of the Mid Coast

2018-09-30 15.29.53.jpg
2018-11-18 13.32.41.jpg
90’ bridge section in Toba

90’ bridge section in Toba

2018-11-20 15.46.11.jpg
2018-12-07 13.08.42.jpg
2019-01-30 09.01.12.jpg

ERP Drill, Performed with the wonderful fellows from the Bella Bella Coast Guard

2018-03-12 13.45.30.jpg
2017-12-13 12.39.43.jpg
6m engineered rail car retaining wall along the Little Toba. 42 x 4” chain anchors mounted to the bedrock.

6m engineered rail car retaining wall along the Little Toba. 42 x 4” chain anchors mounted to the bedrock.

2019-01-31 10.24.38.jpg
2019-01-31 10.24.30.jpg
2019-01-31 15.13.50.jpg
2019-02-05 12.29.00.jpg