Magee creek
located in the Mid coast At the head of Spiller Inlet, 15kms of new new road. beach start with log dump.
Western Lake
Located directly across the inlet from the Magee Creek in Spiller Inlet, 18km of new road. beach start including a log dump.
Amos Point
4.4 Kms of new road from a beach start with a log dump.
Clowhom Lake
With up to 18m rock cuts, this challenging terrain required specific construction procedures. Rock pinning was implemented to ensure bank stabilization.
Toba Inlet
Over 12 kms of reactivation / reconstruction containing stringent environmental restrictions, 2.6 km new construction, Special construction 6m vertical retaining wall, and 12 steel span bridge crossings over fish habitat, ranging from 30’-90’ sections.
Naka Creek
A total of 6.6 kms of new construction and 12.5km of reactivation over 6 headings between Naka Creek and Eve River.