2017-10-24 14.22.09.jpg

Magee creek

located in the Mid coast At the head of Spiller Inlet, 15kms of new new road. beach start with log dump.

2017-03-24 16.32.53.jpg

Western Lake

Located directly across the inlet from the Magee Creek in Spiller Inlet, 18km of new road. beach start including a log dump.

2018-01-10 12.26.51.jpg
 

Amos Point

4.4 Kms of new road from a beach start with a log dump.

2018-09-30 15.29.53.jpg

Clowhom Lake

With up to 18m rock cuts, this challenging terrain required specific construction procedures. Rock pinning was implemented to ensure bank stabilization.

2019-02-27 09.14.07.jpg

Toba Inlet

Over 12 kms of reactivation / reconstruction containing stringent environmental restrictions, 2.6 km new construction, Special construction 6m vertical retaining wall, and 12 steel span bridge crossings over fish habitat, ranging from 30’-90’ sections.

2019-09-23 10.53.13.jpg

Naka Creek

A total of 6.6 kms of new construction and 12.5km of reactivation over 6 headings between Naka Creek and Eve River.